Guided feasibility assessment

Start a renewable energy project

Complete one focused section at a time. Results are saved after the final review.

Assessment draft
01

Project setup

Tell us about the opportunity

This identifies the project in your AFUR workspace.

02

Energy profile

Define current electricity use

Use recent bills or audited consumption where available.

Good input

For variable loads, use a representative 12-month average and retain the source bills for later due diligence.

03

Solar design

Set preliminary PV assumptions

These inputs produce the indicative system size and generation.

04

Battery storage

Screen resilience requirements

Skip storage for a solar-only assessment.

Detailed design requires interval load data, surge loads and an outage profile.

05

Financial assumptions

Set the investment horizon

These assumptions drive payback and discounted cash flow.

06

Grid readiness

Check evidence for formal engagement

The result identifies actions before utility and regulatory review.

Country-specific licensing thresholds, grid codes and procedures must be confirmed with the relevant authority.

07

Review

Confirm the assessment inputs

Return to any step to make changes before calculation.

Preliminary screening

The report supports early decisions and does not replace certified engineering, legal, financial or regulatory advice.

Step 1 of 7